Quality Control for Men's Shoe Production

LIDO Shoes uses defined quality checkpoints from material confirmation and cutting through assembly, finishing and final packing. Each programme is checked against the approved sample, construction details and agreed finishing standard. Guangzhou LIDO Shoes Co., Ltd holds ISO 9001, ISO 14001 and ISO 45001 certifications. Inspection requirements are confirmed by project; we do not publish a universal defect rate or an unsupported quality guarantee.

LIDO finishing station used during men's shoe production in Guangzhou
Finishing is reviewed against the approved sample and project specification before final packing.
Location
Guangzhou, China
Management systems
ISO 9001 / 14001 / 45001
Production reference
Approved sample as production reference
Coverage
Checks through final packing

How quality requirements are set

Material, construction, colour, finishing and packing requirements are confirmed during sampling.

The approved sample and project specification are used as production references.

What is recorded

Checkpoints are defined for the programme instead of being presented as one universal tolerance.

Exceptions are reviewed against the agreed specification before shipment.

What should a buyer ask to see before production?

Ask how the approved sample, material confirmation, construction details, colour, finishing and packing requirements are recorded for the selected programme.

Confirm who reviews changes and how an agreed change is added to the project specification before production proceeds.

What should a buyer confirm before shipment?

Confirm the final inspection record, any reviewed exceptions, packing requirements, carton marks and agreed shipment documents for the selected order.

A buyer may also define its own inspection requirements or arrange an independent inspection according to its sourcing policy.

Evidence and project limitations

StageWhat is checkedProject record
Material confirmationMaterials match the approved sample and specification.Sampling approval and material confirmation.
Cutting and upper preparationCutting and upper preparation follow the agreed construction details.Construction and preparation checks.
Assembly and finishingAssembly and finishing match the agreed standard.Assembly and finishing checkpoints.
Final inspection and packingFinal inspection and packing follow the approved requirements.Inspection and packing record.

Sources

  • Source: LIDO factory process records and approved project specifications.

By LIDO Quality Team