Footwear Production Process
Men's Shoe Manufacturing Process
LIDO Shoes manages men’s footwear development from material and construction confirmation through cutting, upper preparation, assembly, finishing, inspection and packing. Samples for standard constructions and materials are typically ready within 10 days. New lasts, special materials, and complex developments may take longer. The approved sample, project specification and agreed quality checkpoints guide the transition from development to bulk production.

- Standard sample timing
- typically within 10 days
- Complex development
- additional time
- Sampling
- Materials and constructions confirmed during sampling
- Standard order term
- FOB
Development and sampling
The product brief is translated into material, construction, colour and finishing choices for review.
Standard constructions and materials are typically sampled within 10 days; complex development requires additional time.
From approval to bulk production
The approved sample and project specification guide production, inspection and packing.
Changes are confirmed with the buyer rather than assumed during bulk production.
Evidence and project limitations
| Stage | What is confirmed | Project record |
|---|---|---|
| 1. Brief and specification | Product requirements are reviewed. | Approved project specification. |
| 2. Material and construction confirmation | Materials and construction details are confirmed. | Sampling confirmation. |
| 3. Pattern, cutting and upper preparation | Pattern, cutting and upper preparation follow the approved direction. | Development and preparation record. |
| 4. Assembly and finishing | Assembly and finishing follow the approved sample. | Assembly and finishing checkpoints. |
| 5. Inspection and packing | Inspection and packing follow the agreed requirements. | Final inspection and packing record. |
Sources
- Source: LIDO factory process records and the approved project specification.